5. Project: 2401 W. Emaus Avenue - Data Center
Applicant: Quantm Group, LLC
Location: 2401 W. Emaus Avenue
Description: Amended Preliminary/Final land development application of
previously approved plans for a 224,000 SF warehouse building
to be revised into a Data Center use, adding an electrical substation,
sound attenuation walls and associated site improvements.
File: LMA-2022-00010 (Preliminary/Final - Amendment)
Including waivers from existing conditions confirmation of SALDO
§ 350-26 D-
No Opening from building shall be less than 1 foot above the curb elevation.
§ 350-28-C(8)-
The bottom of the pond is to be sloped towards the outlet structure
§ 350-28.E(3)-
Storm sewers shall be required to have a minimum diameter of 15 inches
and shall be made of reinforced concrete unless otherwise noted by the
City Engineer, Sewers shall be installed in sufficient slopes to provide a
minimum velocity of 3 feet per second and a maximum of 15 feet per second
§ 350-32.A- An easement of at least 20 feet in width must be provided along
side or rear lot lines, labeled "General Utility Easements"
Peregrine Tower Has Been Postponed to a Future Meeting
6. POSTPONED - Project: Peregrine Tower
Applicant: Umran Global Investment, LLC
Location: 90 S. 9th Street
Description: Construction of a 37-story mixed-use apartment building and
associated site improvements.
File: LMA-2024-00005 (Preliminary/Final)
Public Comment on Non-Agenda Items