|
Title:
|
R40
Authorization for Contract with Michael Baker International, Inc. in the amount of $233,336.00 to provide consulting and engineering design services related to the D&L Trail: Allentown East Segment Design. This was competitively bid, six (6) bids were received, however, one (1) bid was rejected.
|