Title:
|
R145
Authorization Engagement of Professional Services with Michael Baker International in the amount of $72,708.00 for the addition of an NPDES permit, post construction stormwater management (PCSM) plans to the design of the MLK Trail Phase 1 project at the direction of DEP/Lehigh County Conservation District. This scope also includes revisions to the Erosion and Sediment Control Plan, bid specification documents, and the cost estimate to add the PCSM items to the project.
|